Why Choose G-Pile System

Cost Effective

The G-pile system is more cost effective than conventional piling systems. Significant savings in operational cost can be achieved through the system's simple and rapid pile installation process and better productivity.

Environmentally Friendly

Through the usage of the hydraulic jacking installation process, the G-pile system is practically free of noise, vibration or pollution. A particularly important advantage for regulated city zones, environmentally sensitive sites, and when piling near or within sensitive structures. Furthermore, the work-site will always remain clean and dust-free.

Confidence

During installation, twice the working load is applied on the pile. Each pile is individually test loaded; the guesswork and uncertainty associated with the conventional system is therefore eliminated. This will ensure a high level of quality assurance.

Durability

No wasteful provision is needed in G-pile system as compared to the conventional hammer-driven piling system. Tensile cracks, which normally occur in hammer-driven piles because of impact and reflected stress waves and necking problem in the case of bored pile do not arise in G-pile system. G-pile system is therefore more durable.

Comparison of Various Piling Systems

Item Bored Piles Hammer Driven Piles Hydraulic Jack-In Piles
Noise Average High Low
Vibration Average High Low
Pollution Average High Low
Cost High
(80 cent/tonne.m)
Low
(50 cent/tonne.m)
Average
(60 cent/tonne.m)
Productivity 2-3 piles/day
(600mm dia)
6-7 piles/day
(600mm RC)
6-7 piles/day
(600mm dia)
Limestone Bedrock SLOW and Tedious 30% - 40% pile toe slippage/damage <5% slippage
(Guaranteed)
Quality Check 1% MLT
10% PDA
1% MLT
10% PDA
100% Load
Tested to 2 times of working load.
<1% MLT